HUTCHINSON, Kan. – On March 21st, the Public Works Street/Traffic division noticed that a traffic signal conduit was damaged by construction at the intersection of 11th and Adams. On March 22, 2023, temporary traffic control was installed (stop signs) making the intersection an all-way stop.
The traffic signal repairs should be completed by March 31, 2023.
For more information call Public Works Street/Traffic at 620-694-1900.